PROJECT DEVELOPMENT SUPPORT
Working together with developers designers and main contractors already from the early phase of the project allow us to add more customer value.
Using our customers' needs and expectations as a base, our expertise in design, production and installation provides reliable information for planning, cost estimating and scheduling. As a project team member involved the early phases, we can offer a unique perspective on the construction and property performance later on in the process.
Materials and solutions are fitted within a fast, efficient, industrial construction process, and also help you to secure high sustainability ratings.
|
|
DESIGN SUPPORT
Our designers have wide experience in commercial, logistics and industrial building design. The newest design software, drawings and technical documentation help to reduce construction time and costs.
Including design of the components into the project delivery makes the much-specialized knowledge of our designers available to the project team, and ensures that the designs are optimal for both production and site operations.
|
|
BUILDING INFORMATION MODELLING (BIM)
We use BIM when managing our construction projects. It is used in all phases, from project development design and production to installation. BIM provides our customers with high quality, cost efficiency and a good end result. It offers an accurate and fast 3D modeling environment, which is based on data that simulates the construction virtually. The plans can be shared with contractors and engineers. SCIA Engineer software is used for accurate and optimal design of structures in 3D space.
We transferred our design data to our automatic saw and drilling line in 1996. In 2001 we integrated our 3D modeling with our ERP system SAP. We are continuously developing our BIM usage through the project life-cycle.
Key benefits of BIM to our customers:
·Improved safety by planning the simulation the execution in the mode.
·Visualization of design ideas and changes to find the optimal solutions.
·Careful planning in advance to reduce interference and to ensure smooth progress at the construction site.
·Transparent project follow-up and better communication
·Up-to-date project status.
·Project completed on time and on budget.
|
|
FRAME COMPONENT PRODUCTION
Our building components are industrially produced to fit unique circumstances and technical requirements on site. They fit their location on the construction site minimizing waste and making site operations efficient even though the solution might be complex. This, in turn, reduces workload for all members of the project team.
The professionals at our factories are qualified in their fields, whether that be welding, assembling, surface treatment or coating. We have a strict quality control system, which ensures the safety, quality and efficiency of our production.
|
|
FRAME INSTALLATION
Our experienced and trained site managers and installation crews work hand in hand with project management teams. Work is done on time, in a safe and professional way. We have extensive experience of working in China.
Particular attention is paid to controlling the assembly process. All installation work is carried out with strict safety methods. Project managers, site managers and supervisors ensure the highest level of quality.
With the latest software, specialized manufacturing equipment and skilled installation crews, the processes - from design to fabrication and installation - are integrated. This speeds up the construction process and reduces its costs.
|